Location: Lloydminster, AB
Client: Husky Energy Inc. c/o Bar Engineering Co. Ltd.
Aspire’s scope of work included the fabrication of several water transfer skids with 30 hp hydraulic powered positive displacement pump and vortex water meter. Features include environmental skid, SCADA system control, automated remote emergency shutdown system, full electrical package, and heated building. Responsibilities included mechanical design, and piping, skid, building, and electrical construction.