Location: Edmonton & Hardisty Terminals, AB
Client: Enbridge Pipelines Inc. c/o Stantec Engineering
Five crude oil metering skids are approximately 35 ft wide by 35 ft long by 12 ft tall. Each oil metering manifold is broken down into 3 modules, approximately 10 – 12 ft wide in order to transport within each terminal. The Hardisty terminal is 12 ft wide by 43 ft long by 10 ft tall. Responsibilities include mechanical and electrical engineering design and drawings, piping stress analysis, structural stress analysis. Procurement of all equipment (except the free issued meters), pipe, valves, fittings, structural material, and electrical material. Fabrication activities included mechanical, electrical, instrumentation and coating duties.